Prof. Dr.-Ing. Bernd Scholz Reiter
Deutsch   English
RESEARCH
Bremen Research Cluster for Dynamics in Logistics
Forschungsbereich Intelligente Produktions- und Logistiksysteme (IPS) am BIBA

Projekt:
Technical Product Change Management during the FAST Ramp-Up – Increasing Efficiency and Effectiveness of the Management of Technical Product Changes


Because of shortened product life cycles automobile manufacturers are forced to minimise their product development time and the time-to-market of innovative products. Beside a perfected ramp-up management especially an efficient product change management for the ramp-up phase is of significant importance. The aim of the project "Product Change Management during the FAST Ramp-Up" is to develop methods for the acceleration as well as the systematic transaction of product change management processes. During the project an appropriate knowledge management system for a forward displacement of product changes in cooperation with an automobile manufacturer will be developed. After an improvement of internal product change processes of the automobile manufacturer an optimisation of its external product change management processes within the development network between manufacturer and supplier will be done.


Manager:
Prof. Dr.-Ing.  Bernd Scholz-Reiter  

Person to contact:
Dipl.-Wi.-Ing.  Farian Krohne  

Project Partner:
Daimler Chrysler
Link zum Partner


Acknowledgement:
Der Senator für Wirtschaft und Häfen der Freien Hansestadt Bremen
Link zum Förderer


Duration:
01.12 2004  bis 01.12 2007 

Download of Projektflyer:
deutsch
english

Druckversion
Imprint
Last modified 20.Jun 2012